Welcome to the Club Penguin Wiki! Log in or Create an account to join the community!

Dig Out the Dojo: Difference between revisions

From the Club Penguin Wiki, the free, editable encyclopedia about Club Penguin
Jump to navigation Jump to search
imported>ClubPenguinMaster
28 revisions from oldwiki:Dig Out the Dojo
imported>NickelbackFan37
Line 18: Line 18:


== Gallery ==
== Gallery ==
<gallery captionalign="left">
<gallery captionalign="left">
Image:Newdojo.png|The first part of the outside renovation.
Image:Newdojo.png|The first part of the outside renovation.
Image:Dojo Exterior|The second part of the outside renovation.
Image:Dojo Exterior|The second part of the outside renovation.
Image:New-dojo.PNG|The inside renovation.
Image:New-dojo.PNG|The inside renovation.
dojomap1.PNG|What the Dojo first looked like when it appear on the map.
File:dojomap1.PNG|What the Dojo first looked like when it appear on the map.
dojomap2.PNG|What the Dojo looked like on the map after it was halfway dug out.
File:dojomap2.PNG|What the Dojo looked like on the map after it was halfway dug out.
dojoexteriorbeforestorm.PNG|What the Dojo may have looked like before the storm and renovation.
File:dojoexteriorbeforestorm.PNG|What the Dojo may have looked like before the storm and renovation.
</gallery>
</gallery>
[[Category:Dojo]]
[[Category:Dojo]]
[[Category:Club Penguin]]
[[Category:Club Penguin]]

Revision as of 19:31, 16 January 2011

The Dig Out the Dojo program was presumably started by Sensei, who wandered back to the Dojo (which he actually built) after the Storm, in which the Dojo's roof had been destroyed by lightning.

Stages

Outside Renovation: Part 1

This started on Novermber 3, 2008, after the storm. Penguins were shocked to see a hole in the roof of the Dojo, and a ladder leading to the top. On top there was several snow covered mounds, a torii to one side with a sign that said "DIG OUT THE DOJO", and mountains in the distance. A strange penguin (Sensei) was digging underneath the torii. Penguins were encourage to shovel or drill on the snow.

Outside Renovation: Part 2

This section started on November 11, 2008. Now a waterfall was near the mountains behind the Dojo, a wall and two of the mounds were partly uncovered, a door leading inside was built, and the roof of the Dojo was there.

Inside Renovation

The inside of the Dojo didn't change throughout the program. It had wood laying on the sides of the walls, cones, construction tape, lightbulbs, and a ladder/bridge leading up to the hole in the roof. On November 11, 2008, a sign with pads under said: TRAINING Coming November 17.

Trivia

  • The Yeti rumor started during this event.
  • When the Dojo was completed, you could get a pair of Geta Sandals.

Gallery