Welcome to the Club Penguin Wiki! Log in or Create an account to join the community!

Dig Out the Dojo: Difference between revisions

From the Club Penguin Wiki, the free, editable encyclopedia about Club Penguin
Jump to navigation Jump to search
imported>PabloDePablo
No edit summary
imported>PabloDePablo
No edit summary
Line 13: Line 13:
The inside of the Dojo didn't change throughout the program. It had wood laying on the sides of the walls, cones, construction tape, lightbulbs, and a ladder/bridge leading up to the hole in the roof. On November 11, 2008, a sign with pads under said: TRAINING Coming November 17.
The inside of the Dojo didn't change throughout the program. It had wood laying on the sides of the walls, cones, construction tape, lightbulbs, and a ladder/bridge leading up to the hole in the roof. On November 11, 2008, a sign with pads under said: TRAINING Coming November 17.


====Trivia====
==Trivia==
*The [[Yeti]] rumor started during this.
*The [[Yeti]] rumor started during this.



Revision as of 16:53, 21 November 2009

The Dig Out the Dojo program was started presumably by the Sensei, who wandered back to the Dojo (which he actually built) after the Storm, in which the Dojo's roof had been destroyed by lightning.

Stages

Outside Renovation: Part 1

This started on Novermber 3, 2008, after the storm. Penguins were shocked to see a hole in the roof of the Dojo, and a ladder leading to the top. On top there was several snow covered mounds, a torii to one side with a sign that said "DIG OUT THE DOJO", and mountains in the distance. A strange penguin (Sensei) was digging underneath the torii. Penguins were encourage to shovel or drill on the snow.

Outside Renovation: Part 2

This section started on November 11, 2008. Now a waterfall was near the mountains behind the Dojo, a wall and two of the mounds were partly uncovered, a door leading inside was built, and the roof of the Dojo was there.

Inside Renovation

The inside of the Dojo didn't change throughout the program. It had wood laying on the sides of the walls, cones, construction tape, lightbulbs, and a ladder/bridge leading up to the hole in the roof. On November 11, 2008, a sign with pads under said: TRAINING Coming November 17.

Trivia

  • The Yeti rumor started during this.

Gallery